Monday, 26 January 2015

Feedback from music video - second draft

Feedback:
I thought it would be a good idea to receive some more audience feedback on my second draft of my music video I have done this in the format of a focus group. I believe I have almost finished constructing my video so I feel that to obtain some feedback at this point would be essential as the members of the focus group can inform me on any areas I need to improve on.

Here is some of the feedback:





From the feedback on my second draft of my music video some of the members of my focus group commented on both positive and negative responses. Overall my focus group members liked the idea of the video based on the narrative as they thought the scenes were relevant to the song choice. Some commented on the use of camera angles which I am pleased to here because I really did try to focus on this aspect and make sure I used a number of different camera angles in my video to meet the conventions of other media products. However, some did say that I needed to improve the lip syncing as it was not in time with the song. This has advised me that I need to work on this as I continue to develop my video. 




Tuesday, 13 January 2015

Updated music video




Above is my updated music video which I have working on over the last couple of weeks. I feel that I am almost there but there are a few little areas I need to work on and adjust. 



Thursday, 8 January 2015

Changes to cd disc

I have decided to change the style of my cd disc which will feature inside the digipak. I originally wanted it just to have the artists name at the top and the albums name placed at the bottom of the disc but I felt that this would be quite plain and boring. So instead I have decided to add images of hearts on the right side of the disc to make it more effective and I also feel that this would add a feminine touch.

Here is a draft of what I imagine the disc to look like:



 
I am going to change the font so it's consistent with the font which I have used continuously throughout my ancillary tasks to ensure that I keep its continuity I am also going to change the style of the hearts but I am not to sure whether I want to make them a certain colour.